2 DESIGN & BUILD SOLUTION
This phase of the project will require about 6-7 weeks to complete. Your teacher will identify the specific deadline(s) for the task assignments.
Task
Non-Block Periods
Block Periods
✓
✓+
2.1 Project Schedule
1
1
2.2 Game Design Document
5
3
2.3 Paper Prototype
3
2
2.4 Playtest Paper Prototype
3
2
2.5 Game Code
15-20
10-13
2.6 Game Assets
(15-20)
(10-13)
2.7 Internal Playtesting
(15-20)
(10-13)
2.8 Solution Presentation
3
2
NOTE: Tasks 2.5, 2.6, and 2.7 should be completed in parallel to each other.